mail_outline sales@mediastorehouse.com
250lb Bombs at the Swindon Works, early 1940sAn image of some completed 250lb bombs being loaded onto GWR open wagon No. 44 in December 1940. Like with the majority of the war work undertaken at the Works specialist equipment was built to cater
4000lb Bombs at the Swindon Works, 1940sOver 2, 000 bodies for the 4, 000lb bombs were constructed at Swindon Works. This image taken at the L2 Tank Shop in December 1940 shows the construction of these bodies prior to them being sent to