A Shop Gallery
Available as Framed Prints, Photos, Wall Art and Gift Items
Choose from 29 pictures in our A Shop collection for your Wall Art or Photo Gift. Popular choices include Framed Prints, Canvas Prints, Posters and Jigsaw Puzzles. All professionally made for quick delivery.
GWR Scenic Views
Stations and Halts
Locomotives
Carriages and Wagons
Swindon Works
> Locomotive Works
>> A Shop
>> B Shed
>> F Shop
>> J Shop
>> V Shop
Artwork and documents
The Railway at War
Royalty and Royal Trains
Places
Favourites
People
Signalling
Railway Air Services
Diesel Railcars
Steam Rail Motors
GWR Road Vehicles
GWR Shipping
Images Dated

2-8-0 locomotives under construction in AE shop, 1943
In this image, War Department 2-8-0 locomotives are shown under construction in AE shop at Swindon Works in May 1943. In order to meet the demand for locomotives for war work, the War Department placed an order in 1942 for the GWR to build 80 LMS 8F Class Stanier 2-8-0 freight locomotives, for use both at home and overseas. The short supply of raw materials meant that the building of these locomotives took longer than expected, and this image shows a number of the first batch of 27 engines under construction, over a year after the first order was placed

Tanks under construction in A Erecting Shop, Swindon Works. 1941
One of the earliest tasks contracted to the GWR by the Ministry of Supply was the erection of tanks for supply overseas. Thousands of tank components were being made by all the British railway companies during the initial years of the war, and this image of A Erecting shop at Swindon Works taken in June 1941 shows some of those components being brought together to form the body of 25-27 ton tanks. The tanks under construction are Infantry Tank Mark II, or Matilda II, as they were commonly known. They were difficult and complex tanks to build and required a skilled workforce with specialist machinery to correctly manufacture this model